Skip to content
Quality and safety inspection beside plant piping and an electrical cabinet.

Quality · Health · Safety · Environment

Safe execution. Documented quality.

Averon coordinates industrial work in the Kingdom under disciplined site controls. Specialist partners carry the code stamps and management-system certifications for the scopes they execute.

Integrated QHSE policy

The control follows the work.

One policy covers the lines Averon coordinates. Quality is not a separate brochure from safety. The same standard applies from the drawing issue to the plant permit and the equipment certificate. Averon does not claim a completed ISO certificate of its own. Partner stamps stay with the partner who holds them.

  • Quality

    The right revision, the right inspection and a close-out record. Averon does not hand a client an unmarked file or an untested package.

  • Health

    Protect people on every interface Averon coordinates — from the Al Khobar office through partner site execution.

  • Safety

    Live-plant work starts only under permit-to-work, job safety analysis and the client’s site rules. No shortcuts on a shutdown.

  • Environment

    Plan the work to limit waste, emissions and disturbance, in line with the client’s site environmental rules.

  • Engineering

    Design review and document control sit with Petrocon. Averon checks that the client receives a named revision.

  • Gas and liquid skids

    Fabrication, inspection and test records sit with Autometers Energitec. Averon does not restamp ASME or ISO certificates.

  • Plant maintenance

    Mechanical plant maintenance and campaign shutdowns sit with Sameep. Hot work, lifting and confined space follow the site permit.

  • People and rental equipment

    Manpower support and rented equipment go to site only with competent people, induction and equipment certificates.

Integrity

Code of Conduct

Ethics, integrity and no facilitation payments — the standard for everyone who represents Averon in the Kingdom.

Read the Code

Pre-qualification

Anti-bribery policy

One-page policy for bid files. Zero tolerance for bribery, kickbacks and facilitation payments.

Read the policy

Site execution controls

What we insist on before a tool hits a live plant.

  • PTW / JSA
  • QHSE
  • QA / QC
  • Qualified welding
  • Test & close-out records

Certifications

Code stamps and systems sit with the specialist who executes.

These marks belong to delivery partners. Averon does not restamp their certificates. They travel with the package, the shop or the turnaround crew.

  • Gas and liquid skids

    Autometers Energitec

    • ASME U / U2
    • National Board R
    • ISO 9001
    • ISO 14001
    • ISO 45001

    Works at Greater Noida. Hydrotest to 450 bar.

  • Plant maintenance & shutdowns

    Sameep Industrial Engineering

    • ASME U
    • National Board R

    Navsari fabrication works — two 2,000 m² bays.

  • Engineering & BIM

    Petrocon Engineers & Consultants

    • ISO 19650 practice
    • BIM LOD 100–500

    Design and BIM delivery standards used on partner projects.

Company profile

Download the Averon brochure.

Capability sequence, partner network and in-Kingdom interface — in one PDF.

Talk to Al Khobar

Need QHSE language in a bid or a method statement?

Send an enquiry
LinkedInInstagram